FDOT Conventional Surveying


HSA’s field crews collected survey data for Topography, Alignment, Utilities, Drainage, Cross Sections, Wetlands and Minor DTM areas using EFB data collection and all work performed complied with FDOT procedures, requirements and Surveying and Mapping Standards. HSA calculated and staked the FDOT approved Centerline Alignment, produced Project Control Maps and submitted CAD compliant MicroStation Design files, exported from the CAiCE database, for submittal to the Prime Engineering firm for final project design.

District 3

LPA Group
  • Milling, Resurfacing & Sidewalk design of SR 95/US 29 in Escambia County.  Full survey services performed. (2007)
  • Holmes County Bridge Replacement, Corinth Road over Otter Creek &  Bonifay Chipley Road over Unnamed Branch.  Full survey services performed.  Right-of-Way Map/Maintenance Maps were provided by HSA and were included on the Control Survey Maps. (2008)
Fisher & Arnold Inc.
  • Milling & Resurfacing of SR10 (US 90A) from east of Perdido River Bridge to Pine Cone Dr. in Escambia County.  Full survey services performed. (2008)
  • Milling & Resurfacing of SR 75 (US 231) from Mill Road to north of Brock Road, Jackson County.  Partial survey services performed. (2011)
  • Milling & Resurfacing of SR 75 (US 231) from Mill Road to north of Brock Road, Jackson County.  Partial survey services performed. (2011)
Metric Engineering
Milling & Resurfacing of SR 20 (US 19/27) from west of SR 57 (US 19) to west of J.C. Lee Road in Jefferson County.  Partial survey services performed (2010)

GPI Southeast Inc.
Design Survey from SR 295/SR 727 to SR 289 (9th Ave.) in Escambia County.  Full survey services performed. (2011)

David H. Melvin Inc. Consulting Engineers
SR 22 from the Bay County Line to Wettappo Creek, Bay County.  Partial survey services performed (2011)

BPA Engineers
Milling & Resurfacing of SR 71 (Cecil Costins Blvd.) from the end of the concrete pavement to the Intercoastal Waterway Bridge in Gulf County.  Partial survey services performed (2011)

England, Thims & Miller Inc.
SR 10/US 90 From Summertime Drive to west of SR 4/SR 189 in Okaloosa County.  Full survey services performed. (2011)

Inovia Consulting Group
SR 10 (US 90) from Apex Dr. to east of CR 59 in Leon County. Partial survey services performed. (2011)

McNeil/Carroll Engineering Inc.
SR 30 (US 98/Avenue E), Apalachicola, Franklin County.  Full survey services performed (2012)

David H. Melvin, Inc. Consulting Engineers
Milling & Resurfacing of SR 4 from CR 87A (Market Road) to the Okaloosa County Line, Santa Rosa County. Partial survey services performed (2012)

District-Wide Miscellaneous Surveys

I-10 staking, Escambia County
Stake existing ROW and proposed ROW (2011)

Aenon Church Road, Leon County
Stake existing and proposed ROW (2011)
I-10 Rest Areas, Jefferson County
Full Topographic Surveys and Alignment for 2 Rest Areas (2011)

District 2

England, Thims & Miller Inc.

SR 6 Rail Trail, Hamilton County.  Design survey for improvements to SR 25/SR 51/SR 6 from CR 6 to US 129 in Jasper. (2011)

Motor Carrier Compliance (District 3 & 5)

RS&H

Proposed Way in Motion Sites at the I-95 Virtual Bypass Stations, Flagler County; Wildwood Weigh Station, Marion County, Bunnell Weigh Station, Flagler County and US231 Southbound mainline pull off and Virtual Weigh Station (VWS) design, Jackson County. (2010-2012)

FDOT General Mapping

FDOT Central Surveying and Mapping Office

County General Highway Map Reformatting Project. HSA was awarded a two-year contract in 2004 to rectify the General Highway Maps for each of Florida’s 67 counties and modify the Roadway and PLSS (Public Land Survey System) layers to conform to Florida’s new CADD/GIS standards for published maps for the entire state of Florida. HSA completed 22 approved Highway maps using MicroStation-J, and then assisted the Department in migrating to MicroStation-V8 for the remainder of the contract. (2005)